Huaneng Qinbei Power Plant Phase I and Phase II 2×600 MW Supercritical Coal-fired Power Generation Units Main Plant Construction Project

1、华能沁北电厂项目(机组规模:一期2×600MW,二期2×660MW,三期2×1000MW).jpg

The main steam engine room adopts a double-slope solid-web I-beam purlin system with a span of 30.60 meters. The coal hopper is a 9-meter-diameter circular steel silo with a conical funnel at its bottom, which adopts a 16MNCU steel plate welded structure. The total steel structure weighs 9,446 tonnes.

Honors: China Construction Engineering 'Lu Ban Award', China Electric Power Quality Engineering Award, National Quality Huicheng Silver Award, Henan Province Construction Industry New Technology Application Demonstration Project.